??? 11/01/11 23:36 Read: times |
#184511 - RE Responding to: ???'s previous message |
Thanks Stefan.
The quantity as of now is low. Only this project. So i would be needing at max 3 or 4 boards total. hence i can go with multiple ADCs. The numerical calibration will be needed even with passive amp, so i guess it is better i leave out passive amps. The best point is about load cell failure detection, OR with some good checking, loadcell degrading performance detection would serve as a Early-warning indication for Cleaning / replacing / re-calibrating the loadcells. Thanks for the help. Regards, Zeeshan |